Report 2009-119.1 Recommendation 1 Responses

Report 2009-119.1: California Energy Resources Conservation and Development Commission: It Is Not Fully Prepared to Award and Monitor Millions in Recovery Act Funds and Lacks Controls to Prevent Their Misuse (Release Date: December 2009)

Recommendation #1 To: Energy Commission, California

As expediently as possible, the Energy Commission should take the necessary steps to implement a system of internal controls adequate to provide assurance that Recovery Act funds will be used to meet the purposes of the Recovery Act. These controls should include those necessary to collect and verify the data needed to measure and report on the results of the programs funded by the Recovery Act and to mitigate potential fraud, waste, and abuse. Such steps should include quickly performing the actions already planned, such as assessing the Energy Commission's existing controls and the capacity of its resources and systems, and promptly implementing all needed improvements.

Annual Follow-Up Agency Response From January 2012

The Energy Commission addressed this recommendation through two contracting efforts: 1) an Audit Support Services contract with Perry-Smith LLP to provide a Commission-wide review of controls, processes, and procedures, provide recommendations on areas where controls can be improved/strengthened, and to conduct risk assessments and audits on funding recipients, and 2) a Monitoring, Evaluation, Verification and Reporting contract with KEMA, Inc. to provide programmatic/performance reviews and validation of data collected/reported by funding recipients. (Please see attached letter for specifics of contract milestones achieved to date). (See 2011-041 p. 149)

California State Auditor's Assessment of Annual Follow-Up Status: Fully Implemented